The end of the construction projects requires the production of As-Built drawings. In their production, construction records are checked against detailed design to evaluate the validity of the changes that have been required to incorporate. 

As-built documentation is used for the maintenance of the infrastructure or for future changes to it.

Spain, following the steps of other countries, is introducing the use of the BIM methodology in infrastructure projects. Our team has participated in UK projects using this methodology and benefiting from the advantages it offers. Now we are ready to design projects in BIM applying all our experience.

The scope of expertise of SDEA_Engineering Solutions covers railway, high speed, metro and tram projects.

Contact us to get more information about SDEA capabilities on as-builts documentation.